By understanding our future objectives, we evaluated whether there is a cost reduction component, a capacity component or a quality component that would impact our facility design to ensure our vast competitiveness within the industry. Utilizing Lean and Six Sigma methodologies which are Best In-Class. Such methodologies include but are not limited to:
PROGRAM OVERVIEW
Major projects are complex and time-consuming, and success or failure is often determined by the degree to which they are aligned with the country strategic plans. Establishing the first regional Production Facilities “Egypt Mobile Systems” is a very effective adjunct tool to add on the existing Geopolitical Power of Egypt with fellow African Union, GCC, Middle East countries, and internationally.
Program Development
A combination of world-class skills of expert creative engineering teams from Egypt, Germany, Austria, Spain and China
Production Facility Process Flow
Versatile Facility Lean-Led Manufacturing Plan
01.
Strategic thinking and planning
Architectural planning prepared for the future project expansions to get everything needed ahead of time.
The process flow drawing delineates all production and warehousing equipment. Define the state of workflow by utilizing lean manufacturing and operational flexibility principals. Develop a high level process flow map for each product family, outlining future efficiencies. Provides businesses with a substantial order in protocols.
Give the shape for vague ideas
Sharp strategy design with strict and structured, yet smart and intuitive schedules.
Creating the best ecosystem through enhancement of global technology and industry partnerships, improving the supply-chain management to maximize the use of local components, while coordinating and integrating production mix with/for AU, GCC, middle east, southeast & central Asia, at large.
02.
Program references’ reviews
A testimonial kind of review by program references
Egypt Mobile Systems is a state-strategic and promising project to add on the existing geopolitical power and partnerships with our fellow African, Arab countries and internationally.
H.E. Dr. Mohamed S. AL-Assar | Minister of State | Ministry of Military Production | Egypt
The overall program designs and project management by UniservArabia is exceptional, punctual with great details and intelligent focus.
H.E. Dr. Eng. Hassan A. Abd Elmagied | Vice Chairman and Managing Director | NOMP, Ministry of Military Production | Egypt
Major projects are complex, time-consuming and success or failure is often determined by the degree to which they are aligned to the country strategic plans.